Acanva Fluffy Body Pillow Insert 20x72 White
18.89 USDAvailability: In stock
Acanva Fluffy Body Pillow Insert â Your Ultimate Sleep Companion
Crafted for comfort and support, the Acanva Fluffy Body Pillow Insert is designed to help you relax and sleep better. Its ultra-soft microfiber material provides a gentle, snug embrace that conforms perfectly to your body shape, offering relief to the neck, shoulders, knees, and legs. Whether you're pregnant, nursing, or simply looking for a plush pillow to curl up with a book, this insert is the perfect addition to your sleep routine.
Measuring 20â x 72â, this body pillow insert is ideal for all-night use, from side sleeping to casual reading. It's not just a functional item â it's also a stylish accent for your bedroom. The 100% polyester fabric is skin-friendly, breathable, and machine washable, making it a durable and easy-to-care-for option thatâs built to last. Pair it with a matching pillowcase for a cozy, personalized look that enhances your overall sleep experience.
Key Features
- Comprehensive support for neck, knee, shoulder, and legs
- Hug-like feel for a truly restful sleep experience
- Multi-functional use: pregnancy, nursing, and reading pillow
- 100% polyester material thatâs soft, durable, and easy to clean
- Machine washable for effortless maintenance
Why Choose This Pillow Insert?
Looking for a body pillow that brings both comfort and style to your space? The Acanva Fluffy Body Pillow Insert is engineered with your needs in mind. Its soft, breathable microfiber ensures a relaxing sleep environment, while the contoured design supports your body in all the right places. Whether you're seeking relief during pregnancy, cozy reading time, or just better sleep in general, this insert is a versatile, smart choice for your home.
Additional information
| size | Long 20” x 60”(Pack of 1),Extra-Long 20” x 72”(Pack of 1),20” x 60” (Pack of 1),20” x 60”with Grey Pillowcase,20 in x 54 in,Long20x60(Pack of 1) |
|---|
















